Section 02200 Earthwork

Project Name Section 02200: Earthwork Date Section 02200: Earthwork Page 1 of 10 Section 02200 Earthwork PART 1 - GENERAL 1.01 General Requirements A. The requirements set forth in the General Conditions shall be in addition to the standards provided herein.

SECTION 02700

Backfilling: Provide backfilling under provisions of Section 02200 - Earthwork K. Fill Material: 1. Satisfactory fill material: local sand and rock mixture free of organic material placed in 12" thick loose lifts and thoroughly compacted to a density of not less than 98% of maximum density as ...

02200 21217 Fresh Bread and Rolls, Western Region ...

21217p06.doc/T04 laa New York State Office of General Services Procurement Services Group Corning Tower Building Empire State Plaza Albany, New York 12242 http://www.ogs.state.ny.us PURCHASING MEMORANDUM CONTRACT AWARD NOTIFICATION UPDATE AWARD NUMBER: 21217 DATE: November 19, 2010 PLEASE ...

SECTION 02200 EARTHWORK

BYU CITY FIRE STATION 03/30/01 02200 - 1 SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting earthwork materials to construct the site to the ...

PART 1 - GENERAL

02200 EARTHWORK PART 1 - GENERAL 1.1 SECTION DESCRIPTION A. This section includes the materials and installation standards and contractor responsibilities associated with furnishing all labor, materials, equipment, and incidentals required for clearing, grubbing and filling of undeveloped rights ...

Tapped or Bulk Density or Apparent Volume Test Instrument ...

Tapped or Bulk Density or Apparent Volume Test Instrument - Type PT-TD200 49-02200_09.2.0E Page 1 of 4 PHARMA TEST AG +49 6182 9532-600

Quince Orchard Middle School #2

A. Refer to Section 02200 "Utility Standards". 3.2 EXISTING SYSTEM CONNECTION: A. Notify WSSC no less than 48 hours prior to start of system construction.

A. Work Included: Furnish all labor, material, and equipment ...

Division 2 - Site Work Section 02200 Project No. 06-826 EARTHWORK EARTHWORK 02200-1 PART 1 - GENERAL 1.1 DESCRIPTION A. Work Included: Furnish all labor, material, and equipment necessary to complete all site earthwork, as shown and specified, to include, but not limited to the following: 1.

AUTOMOTIVE EQUIPMENT OPERATOR 1

AUTOMOTIVE EQUIPMENT OPERATOR 1 Job Code Pay Grade 02200 CL6 Nature of Work This is semi-skilled work operating light to medium sized automotive or maintenance equipment.

A. The Contractor shall furnish all labor, materials, tools ...

academy place apartments division 2 - sitework one school street september 18, 2008 gowanda, new york arch project no. 206007 earthwork 02200 - 1 section 02200 - earthwork part i - general 1.01 scope of work a.