Sputtr.com | Alternative Search Engine

Pacificorp

Thermal Units

Pacific Power Rocky Mountain Power PacifiCorp Energy Pacific Power Rocky Mountain Power PacifiCorp Energy Rocky Mountain Power Pacific Power PacifiCorp Energy Horizontal option: Stacked options: A B Thermal Units In addition to the 11 thermal electric plants we operate and own in part or in ...

PacifiCorp to remove Condit Dam

Contact: Tom Gauntt June 14, 2011 PacifiCorp, 503-813-7291 FOR IMMEDIATE RELEASE PacifiCorp to remove Condit Dam With regulatory approvals received after 12 years of effort, decommissioning now working toward October 2011 event PORTLAND, Ore.

PacifiCorp Energy Wyodak Power Station

Re: Wyodak Power Station: Request for Information Under Section 104(e) of the Comprehensive PacifiCorp Energy Wyodak Power Station

Using EtaPRO to Support Pacificorp's Heat Rate Initiative in ...

Why a Heat Rate Initiative Now? In the past, PacifiCorp benefited from low cost coal……… •Heat Rate was secondary to generation •Fuel costs were passed through to customers As one of the lowest-cost electricity producers in the United States, PacifiCorp generates about 8,000 megawatts ...

03-11-08, CA9, Pacificorp: (Docket No. UI 279) Application of ...

item no. ca9 public utility commission of oregon staff report public meeting date: march 11, 2008 regular consent x effective date n/a date: february 26, 2008

XXX FERC ¶ 61,XXX

PacifiCorp's C&T Energy Shortage Process plan contains a step to contact the California Independent System Operator (CAISO) to appeal for assistance.

"PacifiCorp Jim Bridger PowerP lant, Point of Rocks, WY ...

"PacifiCorp Jim Bridger PowerP lant, Point of Rocks, WY; Response to US EPA' s Recommendations Coal Ash Impoundments"

DRAFT ENVIRONMENTAL ASSESSMENT:

DRAFT ENVIRONMENTAL ASSESSMENT: Authorization for Incidental Take and Implementation of the PacifiCorp Klamath Hydroelectric Project Interim

Control Area Readiness Audit Report

NERC 2004 Control Area Readiness Audit PacifiCorp (PACE and PACW) Introduction and Audit Process The NERC Readiness Audit Program is one of the commitments of NERC and the industry following the Northeast Blackout of August 14, 2003, to strengthen the reliability of the North American bulk ...

To be presented at WINDPOWER 2003; Austin, Texas; May 18-21 ...

Assessing Wind Integration Costs with Dispatch Models: A Case Study of PacifiCorp To be presented at WINDPOWER 2003; Austin, Texas; May 18-21, 2003.