Sputtr.com | Alternative Search Engine

Submittal

DEFERRED SUBMITTALS

CITY OF HILLSBORO - BUILDING DEPARTMENT DEFERRED SUBMITTALS PROCEDURES FOR THE DEFERRED SUBMITTAL • A complete list of submittals to be deferred is required at the time of the Building Permit application.

01330 - 1 SUBMITTAL PROCEDURES

october 7, 2006 01330 - 1 submittal procedures construction standard specification section 01330 submittal procedures part 1 - general 1.01 summary.....2

DPD Form - Pre-submittal Conference Application

Revised 04/13/11 . Application for Scheduled Pre-submittal Conferences . SECTION I PROJECT # _____ (Completed by applicant - fill out all sections below)

Department Submittals to the CTC

Environmental documentation can be mailed directly to the CTC at the following address: CALIFORNIA TRANSPORTATION COMMISSION 1120 N Street, Room 2221 (MS-52) Sacramento, CA 95814 The remainder of this memorandum pertains only to submittal requirements when Caltrans is the CEQA lead agency and ...

Sample Submittal Form

Sample Submittal Form March 2010 Sample(s) submitted by (company, person): Project name: TESTING INFORMATION Sample Name/Description (s) (e.g. rootzone mix, etc.): Sample Location/ Date Sampled: Tests to be run (please circle): Particle Size Analysis Gravel Gradation Infiltration Rate USGA ...

Construction Submittal and Shop Drawing Liability

Copyright © 2007 Submittal Exchange, LLC Page 1 of 7 Construction Submittal and Shop Drawing Liability É Risks arising out of the submittal process É How submittals by e-mail can increase risk É The Submittal Exchange ™ system as a tool for mitigating risk October 15, 2007 By Matt Ostanik ...

On Demand Water Heater

SUBMITTAL ODW-199 A On Demand Water Heater Job Name Location Purchaser Engineer Submitted to Reference Approval Construction Submitted to Reference Approval Construction Unit Designation Schedule # ODW Specification Heat Input (Btu/h) 199,000 Btu/h Modulation Range (Btu/h) 26,000-199,000 Btuh ...

LAND DEVELOPMENT MAN UAL Volume I, Chapter 1 Project ...

JANUARY 2011. LAND DEVELOPMENT MANUAL. Volume I, Chapter 1. Project Submittal Requirements. Section . 4. Development Permits/Approvals. DEVELOPMENT SERVICES DEPARTMENT

Dual Purpose Water Heater

SUBMITTAL DPW-199 A Dual Purpose Water Heater Job Name Location Purchaser Engineer Submitted to Reference Approval Construction Unit Desi gnation Schedule # Ut es gat o Scedue# Heating System Data DPW-199A Heat Input (Btu/h) 26,000 - 199,000 AFUE (%) 90 Htg Water Temp (DegF) 122 to 176 DegF ...

Elite Heating Boiler Submittal

Elite Heating Boiler Submittal JOB NAME : LOCATION: ARCH./ ENGR: WHOLESALER : MECH. CONTRACTOR: MODEL NUMBER: TYPE OF GAS: BTU/HR INPUT LOW FIRE: BTU/HR INPUT HIGH FIRE : Heat Exchanger • All Stainless Steel Construction 160 PSI ASME Stamped Construction National Board listed • Gasket less ...